TPS61195EVM-460

Mfr. #: TPS61195EVM-460
Fabricante: Texas Instruments
Descripción: LED Lighting Development Tools TPS61195 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS61195EVM-460 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61195EVM-460 Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with TPS61195. 21 V operating supply voltage range Output current: 160 mA Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory

TPS61195EVM-460 Image

TPS61195EVM-460

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61195EVM-460 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • For Use With: TPS61195
  • Operating Supply Voltage: 21 V
  • Series: TPS61195
  • Description/Function: Evaluation module for TPS61195 96 LED, 8-channel white LED driver for LCD backlight
  • Output Current: 160 mA
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS61195EVM-460

TPS61195EVM-460 Specifications

TPS61195EVM-460 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS61195.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 21 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 160 mA

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed LED Lighting Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top