TPS610981EVM-674

Mfr. #: TPS610981EVM-674
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS610981EVM-674
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS610981EVM-674 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS610981EVM-674 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 700 mV to 4.5 V Input Voltage Output Voltage is 3.3 V Output current: 30 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS610981EVM-674 Image

TPS610981EVM-674

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS610981EVM-674 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: TPS61098x
  • Input Voltage: 700 mV to 4.5 V
  • Output Voltage: 3.3 V
  • Description/Function: Ultra low quiescent current boost evaluation board
  • Output Current: 30 mA
  • Series: TPS610981
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS610981EVM-674

TPS610981EVM-674 Specifications

TPS610981EVM-674 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 700 mV to 4.5 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 30 mA

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top