| Mfr. #: | TPS61096EVM-787 |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools EVM OF TPS61096 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | TPS61096EVM-787 Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 1.8 V to 5.5 V Input Voltage Output Voltage is 18 V Output current: 30 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61096EVM-787 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Voltage Regulators - Switching Regulators.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 1.8 V to 5.5 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 18 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 30 mA
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.