TPS563200EVM-652

Mfr. #: TPS563200EVM-652
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS563200 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS563200EVM-652 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS563200EVM-652 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 17 V Input Voltage Output Voltage is 1.05 V Output current: 0 A to 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS563200. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.108527 oz of Unit Weight

TPS563200EVM-652 Image

TPS563200EVM-652

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS563200EVM-652 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS563200
  • Input Voltage: 4.5 V to 17 V
  • Output Voltage: 1.05 V
  • Description/Function: TPS563200EVM-652 3 A, SWIFT regulator evaluation module
  • Output Current: 0 A to 3 A
  • Series: TPS563200
  • Brand: Texas Instruments
  • For Use With: TPS563200
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.108527 oz

TPS563200EVM-652

TPS563200EVM-652 Specifications

TPS563200EVM-652 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4.5 V to 17 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.05 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 0 A to 3 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TPS563200.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.108527 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top