TPS56302EVM-163

Mfr. #: TPS56302EVM-163
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools High Perf Lo Input Vltg 2-Ch Buck Reg
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS56302EVM-163 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS56302EVM-163 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. Output Voltage is 1.8 V to 3.3 V, 3.3 V to 5 V Output current: 500 mA, 4 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS56302EVM-163 Image

TPS56302EVM-163

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS56302EVM-163 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS56302
  • Output Voltage: 1.8 V to 3.3 V, 3.3 V to 5 V
  • Description/Function: The TPS56302EVM-163 kit allows the designer to easily evaluate the TPS56302 dual output (synchronous-buck and LDO) in a 5 V to 3.3 V (4 A) and 3.3 V to 1.8 V (0.5 A) configuration
  • Output Current: 500 mA, 4 A
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS56302EVM-163

TPS56302EVM-163 Specifications

TPS56302EVM-163 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.8 V to 3.3 V, 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 500 mA, 4 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top