TPS54560EVM-515

Mfr. #: TPS54560EVM-515
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS54560 EVAL MOD
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS54560EVM-515 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54560EVM-515 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 7 V to 60 V Input Voltage Output Voltage is 5 V Output current: 5 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS54560. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.051073 oz of Unit Weight

TPS54560EVM-515 Image

TPS54560EVM-515

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54560EVM-515 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS54560
  • Input Voltage: 7 V to 60 V
  • Output Voltage: 5 V
  • Description/Function: Evaluation module for TPS54560
  • Output Current: 5 A
  • Series: TPS54560
  • Brand: Texas Instruments
  • For Use With: TPS54560
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.051073 oz

TPS54560EVM-515

TPS54560EVM-515 Specifications

TPS54560EVM-515 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 7 V to 60 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 5 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS54560.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.051073 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top