TPS53681EVM-002

Mfr. #: TPS53681EVM-002
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools DUAL-CHANNEL WITH PMBUS SUPPORT
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS53681EVM-002 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS53681EVM-002 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 0.8 V, 0.9 V Output current: 294 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.438976 oz of Unit Weight

TPS53681EVM-002 Image

TPS53681EVM-002

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS53681EVM-002 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS53681
  • Input Voltage: 12 V
  • Output Voltage: 0.8 V, 0.9 V
  • Output Current: 294 A
  • Series: TPS53681
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.438976 oz

TPS53681EVM-002

TPS53681EVM-002 Specifications

TPS53681EVM-002 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 12 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 0.8 V, 0.9 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 294 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.438976 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top