TPS40077EVM-001

Mfr. #: TPS40077EVM-001
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS40077 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS40077EVM-001 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40077EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 1.8 V Dimensions of 76.2 mm x 50.8 mm Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.225076 oz of Unit Weight

TPS40077EVM-001 Image

TPS40077EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40077EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS40077
  • Input Voltage: 12 V
  • Output Voltage: 1.8 V
  • Dimensions: 76.2 mm x 50.8 mm
  • Series: TPS40077
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.225076 oz

TPS40077EVM-001

TPS40077EVM-001 Specifications

TPS40077EVM-001 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Switching Controllers

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 12 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 76.2 mm x 50.8 mm

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.225076 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top