TPS2500EVM-337

Mfr. #: TPS2500EVM-337
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools Eval Mod for TPS2500
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS2500EVM-337 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2500EVM-337 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.074267 oz of Unit Weight

TPS2500EVM-337 Image

TPS2500EVM-337

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2500EVM-337 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS2500
  • Description/Function: The TPS2500DRCEVM is an evaluation module (EVM) for Texas Instruments? family of power-distribution switches with adjustable current-limit
  • Series: TPS2500
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.074267 oz

TPS2500EVM-337

TPS2500EVM-337 Specifications

TPS2500EVM-337 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 125 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.074267 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top