TPS2358EVM

Mfr. #: TPS2358EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools TPS2358 Dual-Slot ATCA Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS2358EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2358EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Hot Swap Voltage Controllers type. 3.3 V, 12 V Input Voltage Dimensions of 117.6 mm x 152.4 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2358EVM Image

TPS2358EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2358EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS2358
  • Input Voltage: 3.3 V, 12 V
  • Dimensions: 117.6 mm x 152.4 mm
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2358EVM

TPS2358EVM Specifications

TPS2358EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Hot Swap Voltage Controllers

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.3 V, 12 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 117.6 mm x 152.4 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top