| Mfr. #: | TPS22958EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools TPS22958EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | TPS22958EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 600 mV to 5.5 V Input Voltage Output Voltage is 5.5 V Bulk packaging for easy dispensing Output current: 4 A/6 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.046056 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22958EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Load Switches.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 600 mV to 5.5 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 5.5 V.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 4 A/6 A
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 105 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.046056 oz.