TPS2066EVM-293

Mfr. #: TPS2066EVM-293
Fabricante: Texas Instruments
Descripción: Switch IC Development Tools TPS2066EVM-293 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS2066EVM-293 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2066EVM-293 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB Switches type. Texas Instruments is a trusted brand for quality electronics 2.7 V to 5.5 V operating supply voltage range Switch IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.162030 oz of Unit Weight

TPS2066EVM-293 Image

TPS2066EVM-293

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2066EVM-293 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Switch IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: USB Switches
  • Tool Is For Evaluation Of: TPS2066D
  • Description/Function: Two channel, current-limited power distribution switch
  • Brand: Texas Instruments
  • Operating Supply Current: 1.5 A
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Product Type: Switch IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.162030 oz

TPS2066EVM-293

TPS2066EVM-293 Specifications

TPS2066EVM-293 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is USB Switches.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V to 5.5 V

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Switch IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.162030 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top