TPS2063EVM-294

Mfr. #: TPS2063EVM-294
Fabricante: Texas Instruments
Descripción: Switch IC Development Tools TPS2063 Eval module
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPS2063EVM-294 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2063EVM-294 Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Switch IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2063EVM-294 Image

TPS2063EVM-294

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2063EVM-294 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Switch IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TPS2063D
  • Brand: Texas Instruments
  • Product Type: Switch IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2063EVM-294

TPS2063EVM-294 Specifications

TPS2063EVM-294 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Switch IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top