TPA6211A1EVM

Mfr. #: TPA6211A1EVM
Fabricante: Texas Instruments
Descripción: Audio IC Development Tools TPA6211A1 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPA6211A1EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA6211A1EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 5 V to 15 V operating supply voltage range Output power: 3.1 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.003848 oz of Unit Weight

TPA6211A1EVM Image

TPA6211A1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA6211A1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA6211A1
  • Operating Supply Voltage: 5 V to 15 V
  • Output Power: 3.1 W
  • Series: TPA6211A1
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.003848 oz

TPA6211A1EVM

TPA6211A1EVM Specifications

TPA6211A1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V to 15 V

  • A: What is the Output Power of the product?

    Q: The Output Power of the product is 3.1 W.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.003848 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top