TPA3121D2EVM

Mfr. #: TPA3121D2EVM
Fabricante: Texas Instruments
Descripción: Audio IC Development Tools TPA3121D2EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TPA3121D2EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3121D2EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 10 V to 26 V operating supply voltage range Output power: 10 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3121D2EVM Image

TPA3121D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3121D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3121D2
  • Operating Supply Voltage: 10 V to 26 V
  • Output Power: 10 W
  • Series: TPA3121D2
  • Brand: Texas Instruments
  • Operating Supply Current: 3 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3121D2EVM

TPA3121D2EVM Specifications

TPA3121D2EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 10 V to 26 V.

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 10 W.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top