TLV320DAC26EVM

Mfr. #: TLV320DAC26EVM
Fabricante: Texas Instruments
Descripción: Audio IC Development Tools TLV320DAC26 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TLV320DAC26EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV320DAC26EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio type. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TLV320DAC26EVM Image

TLV320DAC26EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV320DAC26EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio
  • Tool Is For Evaluation Of: TLV320DAC26
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TLV320DAC26EVM

TLV320DAC26EVM Specifications

TLV320DAC26EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Type of the product?

    Q: The Type of the product is Audio.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top