TLV320AIC1103EVM

Mfr. #: TLV320AIC1103EVM
Fabricante: Texas Instruments
Descripción: Audio IC Development Tools TLV320AIC1103 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TLV320AIC1103EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV320AIC1103EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TLV320AIC1103EVM Image

TLV320AIC1103EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV320AIC1103EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio
  • Tool Is For Evaluation Of: TLV320AIC1103
  • Operating Supply Voltage: 3.3 V
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TLV320AIC1103EVM

TLV320AIC1103EVM Specifications

TLV320AIC1103EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Type of the product?

    Q: The Type of the product is Audio.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top