TIOS1015EVM

Mfr. #: TIOS1015EVM
Fabricante: Texas Instruments
Descripción: Interface Development Tools TIOS1015 EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TIOS1015EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TIOS1015EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Digital Output Drivers type. Texas Instruments is a trusted brand for quality electronics 24 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TIOS1015EVM Image

TIOS1015EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TIOS1015EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Digital Output Drivers
  • Tool Is For Evaluation Of: TIOS1015
  • Description/Function: Evaluates the TIOS1015 digital output driver
  • Series: TIOS101
  • Brand: Texas Instruments
  • Operating Supply Voltage: 24 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TIOS1015EVM

TIOS1015EVM Specifications

TIOS1015EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Digital Output Drivers.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 24 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top