TAS5162DKD6EVM

Mfr. #: TAS5162DKD6EVM
Fabricante: Texas Instruments
Descripción: Audio IC Development Tools TAS5162DKD6EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: TAS5162DKD6EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5162DKD6EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS5162DKD6EVM Image

TAS5162DKD6EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5162DKD6EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS5518, TAS5162
  • Series: TAS5162DKD6
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS5162DKD6EVM

TAS5162DKD6EVM Specifications

TAS5162DKD6EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top