PCM2705EVM-U

Mfr. #: PCM2705EVM-U
Fabricante: Texas Instruments
Descripción: Audio IC Development Tools PCM2705EVM-U
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: PCM2705EVM-U Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM2705EVM-U Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PCM2705EVM-U Image

PCM2705EVM-U

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM2705EVM-U Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio
  • Tool Is For Evaluation Of: PCM2705
  • Series: PCM2705
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PCM2705EVM-U

PCM2705EVM-U Specifications

PCM2705EVM-U FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Type of the product?

    Q: The Type of the product is Audio.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top