PCM1864EVM

Mfr. #: PCM1864EVM
Fabricante: Texas Instruments
Descripción: Audio IC Development Tools PCM1864EVM-SW Contr Evaluation Module
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: PCM1864EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM1864EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Audio type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with USB-I2X. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PCM1864EVM Image

PCM1864EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM1864EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Audio
  • Tool Is For Evaluation Of: PCM1864
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluation board for the PCM186x family of ADCs
  • Series: PCM1864
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: USB-I2X
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PCM1864EVM

PCM1864EVM Specifications

PCM1864EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: At what frequency does the For Use With?

    Q: The product For Use With is USB-I2X.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top