MCIMX7D5EVM10SD

Mfr. #: MCIMX7D5EVM10SD
Fabricante: NXP Semiconductors
Descripción: Processors - Application Specialized MCIMX7D5EVM10SD/LFBGA541///TRAY MULTIPLE DP BAKEAB
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: MCIMX7D5EVM10SD Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
MCIMX7D5EVM10SD Overview

This product is manufactured by NXP. The product can operate at a maximum temperature of SMD/SMT. BGA-541 package/case type is utilized by this product. The Industrial Applications for this product. This product's ARM Cortex A7, ARM Cortex M4 is an ARM Cortex M3. This product has a Data Bus Width of 32 bit. The Maximum Clock Frequency of this product is 1 GHz. 1.2 V to 1.25 V operating supply voltage range The minimum operating temperature of this product is - 20 C. The product can operate at a maximum temperature of + 105 C. Tray packaging for easy dispensing This product features DDR3, DDR3L, LPDDR2, LPDDR3 memory type for improved performance and speed. NXP Semiconductors is a trusted brand for quality electronics The Data RAM Size of this product is 256 kB. The Data ROM Size is 96 kB. Interface Type: I2C, JTAG, PCI, SAI, UART Floating Point instruction type supported. Yes regarding Moisture Sensitivity Processors - Application Specialized product type 84 of 100 Processors - Application Specialized as subcategory The product's i.MX is Blue Gecko. This product is also known by the 935352046557 number of 934069005115. 1. 0.032170 oz of Unit Weight

MCIMX7D5EVM10SD Image

MCIMX7D5EVM10SD

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MCIMX7D5EVM10SD Specifications
  • Manufacturer: NXP
  • Product Category: Processors - Application Specialized
  • RoHS: Y
  • Mounting Style: SMD/SMT
  • Package / Case: BGA-541
  • Series: i.MX 7Dual
  • Application: Industrial Applications
  • Core: ARM Cortex A7, ARM Cortex M4
  • Number of Cores: 3 Core
  • Data Bus Width: 32 bit
  • Maximum Clock Frequency: 1 GHz
  • L1 Cache Instruction Memory: 32 kB, 16 kB
  • L1 Cache Data Memory: 32 kB, 16 kB
  • Operating Supply Voltage: 1.2 V to 1.25 V
  • Minimum Operating Temperature: - 20 C
  • Maximum Operating Temperature: + 105 C
  • Packaging: Tray
  • Memory Type: DDR3, DDR3L, LPDDR2, LPDDR3
  • Brand: NXP Semiconductors
  • Data RAM Size: 256 kB
  • Data ROM Size: 96 kB
  • Interface Type: I2C, JTAG, PCI, SAI, UART
  • Instruction Type: Floating Point
  • L2 Cache Instruction / Data Memory: 512 kB
  • Moisture Sensitive: Yes
  • Processor Series: i.MX 7Dual
  • Product Type: Processors - Application Specialized
  • Factory Pack Quantity: 84
  • Subcategory: Processors - Application Specialized
  • Tradename: i.MX
  • Watchdog Timers: Watchdog Timer
  • Part # Aliases: 935352046557
  • Unit Weight: 0.032170 oz

MCIMX7D5EVM10SD

MCIMX7D5EVM10SD Specifications

MCIMX7D5EVM10SD FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed NXP

  • A: Is the cutoff frequency of the product Mounting Style?

    Q: Yes, the product's Mounting Style is indeed SMD/SMT

  • A: At what frequency does the Package / Case?

    Q: The product Package / Case is BGA-541.

  • A: Is the cutoff frequency of the product Application?

    Q: Yes, the product's Application is indeed Industrial Applications

  • A: What is the Core of the product?

    Q: The Core of the product is ARM Cortex A7, ARM Cortex M4.

  • A: At what frequency does the Data Bus Width?

    Q: The product Data Bus Width is 32 bit.

  • A: What is the Maximum Clock Frequency of the product?

    Q: The Maximum Clock Frequency of the product is 1 GHz.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.2 V to 1.25 V.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 20 C

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 105 C.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Tray

  • A: What is the Memory Type of the product?

    Q: The Memory Type of the product is DDR3, DDR3L, LPDDR2, LPDDR3.

  • A: At what frequency does the Brand?

    Q: The product Brand is NXP Semiconductors.

  • A: Is the cutoff frequency of the product Data RAM Size?

    Q: Yes, the product's Data RAM Size is indeed 256 kB

  • A: What is the Data ROM Size of the product?

    Q: The Data ROM Size of the product is 96 kB.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, JTAG, PCI, SAI, UART.

  • A: Is the cutoff frequency of the product Instruction Type?

    Q: Yes, the product's Instruction Type is indeed Floating Point

  • A: Is the cutoff frequency of the product Moisture Sensitive?

    Q: Yes, the product's Moisture Sensitive is indeed Yes

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Processors - Application Specialized.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 84

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Processors - Application Specialized.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is i.MX.

  • A: Is the cutoff frequency of the product Part # Aliases?

    Q: Yes, the product's Part # Aliases is indeed 935352046557

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.032170 oz

846 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
1
24,92 US$
24,92 US$
5
24,66 US$
123,30 US$
10
22,98 US$
229,80 US$
25
21,95 US$
548,75 US$
100
19,63 US$
1 963,00 US$
250
18,72 US$
4 680,00 US$
500
17,82 US$
8 910,00 US$
Top