LP8555EVM

Mfr. #: LP8555EVM
Fabricante: Texas Instruments
Descripción: LED Lighting Development Tools LP8555EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LP8555EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP8555EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.086553 oz of Unit Weight

LP8555EVM Image

LP8555EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8555EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Series: LP8555
  • Packaging: Bulk
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.086553 oz

LP8555EVM

LP8555EVM Specifications

LP8555EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is LED Lighting Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.086553 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top