LP2951EVM

Mfr. #: LP2951EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools LP2951EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LP2951EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP2951EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 30 V Input Voltage Output Voltage is 5 V, 1.235 V to 29 V Output current: 100 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LP2951EVM Image

LP2951EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP2951EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: LP2951
  • Input Voltage: 30 V
  • Output Voltage: 5 V, 1.235 V to 29 V
  • Description/Function: Evaluates the LP2951 family of LDOs
  • Output Current: 100 mA
  • Series: LP2951
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LP2951EVM

LP2951EVM Specifications

LP2951EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 30 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V, 1.235 V to 29 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 100 mA

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top