| Mfr. #: | LMZ20502EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools LMZ20502 EVAL MOD |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | LMZ20502EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the AC/DC Converters type. 2.7 V to 5.5 V Input Voltage Output Voltage is 1.8 V Dimensions of 64 mm x 27 mm Output current: 2 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ20502. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 0.022743 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ20502EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed AC/DC Converters
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 2.7 V to 5.5 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 1.8 V
A: Is the cutoff frequency of the product Dimensions?
Q: Yes, the product's Dimensions is indeed 64 mm x 27 mm
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 2 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed LMZ20502
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: Is the cutoff frequency of the product Tradename?
Q: Yes, the product's Tradename is indeed SIMPLE SWITCHER
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.022743 oz