| Mfr. #: | LMX2582EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | RF Development Tools LMX2582EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | LMX2582EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the RF Synthesizers type. Frequency range: 5 MHz to 1.4 GHz 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory The product's PLLATINUM is Blue Gecko. 1. 0.499120 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMX2582EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed RF Synthesizers
A: What is the Frequency of the product?
Q: The Frequency of the product is 5 MHz to 1.4 GHz.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 3.3 V.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed RF Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Tradename?
Q: Yes, the product's Tradename is indeed PLLATINUM
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.499120 oz.