LMK04832EVM

Mfr. #: LMK04832EVM
Fabricante: Texas Instruments
Descripción: Clock & Timer Development Tools LMK04832EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LMK04832EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMK04832EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Distributions type. Frequency range: 122.88 MHz Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB 3.3 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

LMK04832EVM Image

LMK04832EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK04832EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Clock Distributions
  • Tool Is For Evaluation Of: LMK04832
  • Frequency: 122.88 MHz
  • Packaging: Bulk
  • Series: LMK04832
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Operating Supply Voltage: 3.3 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMK04832EVM

LMK04832EVM Specifications

LMK04832EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Distributions

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 122.88 MHz.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SPI, USB

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top