LMK04616EVM

Mfr. #: LMK04616EVM
Fabricante: Texas Instruments
Descripción: Clock & Timer Development Tools LMK04616EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LMK04616EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMK04616EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Jitters type. Frequency range: 122.88 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB 5 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

LMK04616EVM Image

LMK04616EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK04616EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Clock Jitters
  • Tool Is For Evaluation Of: LMK04616
  • Frequency: 122.88 MHz
  • Description/Function: Evaluates the LMK04616 dual loop jitter cleaner
  • Series: LMK04616
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Operating Supply Voltage: 5 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMK04616EVM

LMK04616EVM Specifications

LMK04616EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Clock Jitters.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 122.88 MHz

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI, USB.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top