| Mfr. #: | LMK04610EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Clock & Timer Development Tools EVM FOR LMK04610 ANALOG JITTER CLEANER |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | LMK04610EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Jitters type. Frequency range: 122.88 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK04610EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Clock Jitters.
A: Is the cutoff frequency of the product Frequency?
Q: Yes, the product's Frequency is indeed 122.88 MHz
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is USB.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 5 V.
A: What is the Product Type of the product?
Q: The Product Type of the product is Clock & Timer Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.