LMH6401EVM

Mfr. #: LMH6401EVM
Fabricante: Texas Instruments
Descripción: Amplifier IC Development Tools LMH6401 Eval Module
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LMH6401EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMH6401EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Variable Gain Amplifiers type. 4 V to 5.25 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA, USB Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory The product's LMH is Blue Gecko.

LMH6401EVM Image

LMH6401EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMH6401EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Variable Gain Amplifiers
  • Tool Is For Evaluation Of: LMH6401
  • Operating Supply Voltage: 4 V to 5.25 V
  • Description/Function: Evaluates the single LMH6401 DVGA
  • Series: LMH6401
  • Brand: Texas Instruments
  • Interface Type: SMA, USB
  • Operating Supply Current: 69 mA
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: LMH

LMH6401EVM

LMH6401EVM Specifications

LMH6401EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Variable Gain Amplifiers.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 4 V to 5.25 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SMA, USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is LMH.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top