LMG1210EVM-012

Mfr. #: LMG1210EVM-012
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools LMG1210EVM-012
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LMG1210EVM-012 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMG1210EVM-012 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 100 V Input Voltage Output Voltage is 100 V Texas Instruments is a trusted brand for quality electronics Compatible with LMG1210EVM-012. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LMG1210EVM-012 Image

LMG1210EVM-012

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMG1210EVM-012 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: LMG1210EVM-012
  • Input Voltage: 100 V
  • Output Voltage: 100 V
  • Description/Function: Half-bridge open loop evaluation module
  • Series: LMG1210
  • Brand: Texas Instruments
  • For Use With: LMG1210EVM-012
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMG1210EVM-012

LMG1210EVM-012 Specifications

LMG1210EVM-012 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Distributions

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 100 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 100 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is LMG1210EVM-012.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

82 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top