LM26EVM

Mfr. #: LM26EVM
Fabricante: Texas Instruments
Descripción: Temperature Sensor Development Tools LM26EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LM26EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM26EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Temperature Sensor type. 2.7 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.014289 oz of Unit Weight

LM26EVM Image

LM26EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM26EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Temperature Sensor
  • Tool Is For Evaluation Of: LM26
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Series: LM26
  • Brand: Texas Instruments
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.014289 oz

LM26EVM

LM26EVM Specifications

LM26EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensor.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V to 5.5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Temperature Sensor Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.014289 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top