LDO-PARAL-DESG-EVM

Mfr. #: LDO-PARAL-DESG-EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools LDO PARALLEL DESIGN WITH TPS7B4253-Q1
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: LDO-PARAL-DESG-EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LDO-PARAL-DESG-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 4 V to 40 V Input Voltage Output Voltage is 5 V Output current: 900 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.096302 oz of Unit Weight

LDO-PARAL-DESG-EVM Image

LDO-PARAL-DESG-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDO-PARAL-DESG-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7B4253-Q1, TPS7B6750-Q1
  • Input Voltage: 4 V to 40 V
  • Output Voltage: 5 V
  • Output Current: 900 mA
  • Series: TPS7B4253-Q1
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.096302 oz

LDO-PARAL-DESG-EVM

LDO-PARAL-DESG-EVM Specifications

LDO-PARAL-DESG-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4 V to 40 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 5 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 900 mA.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.096302 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top