| Mfr. #: | IO-EXPANDER-EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Interface Development Tools I2C and SMBus IO Expander EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | IO-EXPANDER-EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the I/O Expander type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, Serial, SMBus, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. 1.65 V to 5.5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

IO-EXPANDER-EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed I/O Expander
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed I2C, Serial, SMBus, USB
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 1.65 V to 5.5 V.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Interface Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools