INA230EVM

Mfr. #: INA230EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools INA230 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: INA230EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA230EVM Overview

This product is manufactured by Texas Instruments. Evaluation Kits This device belongs to the Current Monitors & Regulators type. 5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.143278 oz of Unit Weight

INA230EVM Image

INA230EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA230EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Kits
  • Type: Current Monitors & Regulators
  • Tool Is For Evaluation Of: INA230
  • Input Voltage: 5 V
  • Description/Function: The INA230EVM is a platform for evaluating the performance of the INA230 under various signal, shunt, and supply conditions.
  • Series: INA230
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.143278 oz

INA230EVM

INA230EVM Specifications

INA230EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Current Monitors & Regulators

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.143278 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top