GC5016EVM

Mfr. #: GC5016EVM
Fabricante: Texas Instruments
Descripción: RF Development Tools GC5016 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: GC5016EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
GC5016EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Up-Down Converters type. Frequency range: 160 MHz 1.8 V, 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: GUI Compatible with GC101EVM. RF Development Tools product type 1 of 100 Development Tools as subcategory

GC5016EVM Image

GC5016EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

GC5016EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Up-Down Converters
  • Tool Is For Evaluation Of: GC5016
  • Frequency: 160 MHz
  • Operating Supply Voltage: 1.8 V, 3.3 V
  • Description/Function: Used to evaluate the GC5016, Wideband Quad Digital Down-Converter/Up-Converter
  • Brand: Texas Instruments
  • Interface Type: GUI
  • For Use With: GC101EVM
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

GC5016EVM

GC5016EVM Specifications

GC5016EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Up-Down Converters.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 160 MHz.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 1.8 V, 3.3 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is GUI.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is GC101EVM.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top