| Mfr. #: | EM1402EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools BQ76PL455EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | EM1402EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 70 V Input Voltage Output Voltage is 5 V Dimensions of 5.5 in x 3.75 in Texas Instruments is a trusted brand for quality electronics Interface Type: UART The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EM1402EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Battery Management
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 70 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 5 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 5.5 in x 3.75 in.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is UART.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.