| Mfr. #: | DRV8885EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools DRV8885EVM |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | DRV8885EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 8 V to 37 V Input Voltage Output current: 1.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8885EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 8 V to 37 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 1.5 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.