DRV8880EVM

Mfr. #: DRV8880EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools DRV8880EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DRV8880EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8880EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 6.5 V to 45 V Input Voltage Bulk packaging for easy dispensing Output current: 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8880EVM Image

DRV8880EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8880EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8880
  • Input Voltage: 6.5 V to 45 V
  • Packaging: Bulk
  • Description/Function: DRV8880 dual half-bridge motor driver evaluation module
  • Output Current: 2 A
  • Series: DRV8880
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8880EVM

DRV8880EVM Specifications

DRV8880EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 6.5 V to 45 V.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top