DRV8843EVM

Mfr. #: DRV8843EVM
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools DRV8843EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DRV8843EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8843EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Motor / Motion Controllers & Drivers type. Output current: 2.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8843EVM Image

DRV8843EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8843EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8843
  • Output Current: 2.5 A
  • Series: DRV8843
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8843EVM

DRV8843EVM Specifications

DRV8843EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2.5 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top