| Mfr. #: | DRV8825EVM |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools Eval Mod for DRV8825 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | DRV8825EVM Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Motor / Motion Controllers & Drivers type. Output current: 2.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.335216 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8825EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Motor / Motion Controllers & Drivers.
A: What is the Output Current of the product?
Q: The Output Current of the product is 2.5 A.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.335216 oz