DOLPHIN-LP-EVM

Mfr. #: DOLPHIN-LP-EVM
Fabricante: Texas Instruments
Descripción: RF Development Tools Dolphin Low Pow Eval Kit
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DOLPHIN-LP-EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DOLPHIN-LP-EVM Overview

This product is manufactured by Texas Instruments. Development Kits Frequency range: 915 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: RS-232, UART RF Development Tools product type 1 of 100 Development Tools as subcategory

DOLPHIN-LP-EVM Image

DOLPHIN-LP-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DOLPHIN-LP-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: N
  • Product: Development Kits
  • Frequency: 915 MHz
  • Brand: Texas Instruments
  • Interface Type: RS-232, UART
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DOLPHIN-LP-EVM

DOLPHIN-LP-EVM Specifications

DOLPHIN-LP-EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Development Kits.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 915 MHz

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed RS-232, UART

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top