DLPDLCR3310EVM

Mfr. #: DLPDLCR3310EVM
Fabricante: Texas Instruments
Descripción: Display Development Tools DLP LIGHTCRAFTER DISPLAY 3310 EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DLPDLCR3310EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR3310EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 3.3 V, 5 V operating supply voltage range Interface Type: I2C, SPI, USB Texas Instruments is a trusted brand for quality electronics Display Development Tools product type 1 of 100 Development Tools as subcategory The product's DLP is Blue Gecko.

DLPDLCR3310EVM Image

DLPDLCR3310EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR3310EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DLP3310
  • Operating Supply Voltage: 3.3 V, 5 V
  • Interface Type: I2C, SPI, USB
  • Series: DLP3310
  • Brand: Texas Instruments
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: DLP

DLPDLCR3310EVM

DLPDLCR3310EVM Specifications

DLPDLCR3310EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V, 5 V.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, SPI, USB.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Display Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is DLP.

12 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top