DAC8560EVM-PDK

Mfr. #: DAC8560EVM-PDK
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools DAC8560 Perf Demo Kit
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DAC8560EVM-PDK Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8560EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 2.7 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC8560EVM-PDK Image

DAC8560EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8560EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC8560
  • Operating Supply Voltage: 2.7 V to 5 V
  • Series: DAC8560
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC8560EVM-PDK

DAC8560EVM-PDK Specifications

DAC8560EVM-PDK FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.7 V to 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top