DAC38RF87EVM

Mfr. #: DAC38RF87EVM
Fabricante: Texas Instruments
Descripción: Data Conversion IC Development Tools DAC38RF87EVM
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: DAC38RF87EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC38RF87EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the DAC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.123787 oz of Unit Weight

DAC38RF87EVM Image

DAC38RF87EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC38RF87EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: DAC
  • Tool Is For Evaluation Of: DAC38RF87
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluates the DAC38RF87 digital-to-analog converter
  • Series: DAC38RF87
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.123787 oz

DAC38RF87EVM

DAC38RF87EVM Specifications

DAC38RF87EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.123787 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top