CDCM9102EVM

Mfr. #: CDCM9102EVM
Fabricante: Texas Instruments
Descripción: Clock & Timer Development Tools CDCM9102 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: CDCM9102EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCM9102EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Generators type. Frequency range: 100 MHz Texas Instruments is a trusted brand for quality electronics 3 V to 3.6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory 1. 1 oz of Unit Weight

CDCM9102EVM Image

CDCM9102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCM9102EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Clock Generators
  • Tool Is For Evaluation Of: CDCM9102
  • Frequency: 100 MHz
  • Series: CDCM9102
  • Brand: Texas Instruments
  • Operating Supply Voltage: 3 V to 3.6 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1 oz

CDCM9102EVM

CDCM9102EVM Specifications

CDCM9102EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Generators

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 100 MHz.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3 V to 3.6 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 1 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top