CDCLVD2106EVM

Mfr. #: CDCLVD2106EVM
Fabricante: Texas Instruments
Descripción: Clock & Timer Development Tools CDCLVD2106 Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: CDCLVD2106EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVD2106EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics The minimum operating temperature of this product is - 40 C. Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCLVD2106EVM Image

CDCLVD2106EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVD2106EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: E
  • Tool Is For Evaluation Of: CDCLVD2106
  • Series: CDCLVD2106
  • Brand: Texas Instruments
  • Minimum Operating Temperature: - 40 C
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCLVD2106EVM

CDCLVD2106EVM Specifications

CDCLVD2106EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top