CDCEL925PERF-EVM

Mfr. #: CDCEL925PERF-EVM
Fabricante: Texas Instruments
Descripción: Clock & Timer Development Tools CDCEL925 Perf Eval Mod
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: CDCEL925PERF-EVM Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCEL925PERF-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Synthesizers type. Frequency range: 230 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: USB 1.8 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCEL925PERF-EVM Image

CDCEL925PERF-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCEL925PERF-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Synthesizers
  • Tool Is For Evaluation Of: CDCEL925
  • Frequency: 230 MHz
  • Series: CDCEL9xx
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 1.8 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCEL925PERF-EVM

CDCEL925PERF-EVM Specifications

CDCEL925PERF-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Synthesizers

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 230 MHz.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Clock & Timer Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top