BQ50002EVM-607

Mfr. #: BQ50002EVM-607
Fabricante: Texas Instruments
Descripción: Power Management IC Development Tools w/NVSRAM Control Watchdog Timer
Ciclo vital: Nuevo de este fabricante.
Ficha de datos: BQ50002EVM-607 Ficha de datos
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ50002EVM-607 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Wireless Charging - Transmitters type. 5 V Input Voltage Output Voltage is 5 V Output current: 1.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ50002EVM-607 Image

BQ50002EVM-607

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ50002EVM-607 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Wireless Charging - Transmitters
  • Tool Is For Evaluation Of: BQ50002
  • Input Voltage: 5 V
  • Output Voltage: 5 V
  • Description/Function: BQ50002 wireless power transmitter evaluation module
  • Output Current: 1.5 A
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ50002EVM-607

BQ50002EVM-607 Specifications

BQ50002EVM-607 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Wireless Charging - Transmitters.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 5 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 1.5 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Cantidad
Precio unitario
Ext. Precio
Top