| Mfr. #: | BQ33100EVM-001 |
|---|---|
| Fabricante: | Texas Instruments |
| Descripción: | Power Management IC Development Tools Eval Mod for bq33100 |
| Ciclo vital: | Nuevo de este fabricante. |
| Ficha de datos: | BQ33100EVM-001 Ficha de datos |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 12 V Input Voltage Dimensions of 76.2 mm x 50.8 mm Output current: 7 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with EV2300. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.202248 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ33100EVM-001 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Battery Management.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 12 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 76.2 mm x 50.8 mm.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 7 A
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed USB
A: At what frequency does the For Use With?
Q: The product For Use With is EV2300.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.202248 oz.